Project

Construction Monitoring – Alexandria Bridge Upgrade

Date

Spring 2017 – Spring 2018

Location

Alexandria Bridge

Client

Surespan Group

Project Team

Adam Patterson, Scott Hawker, Carrielynn Victor

Collaborators

Ecora Resource

Overview

Project 3 - Construction Monitoring – Alexandra Bridge UpgradeThe Alexandria Bridge is 490 metres long and crosses the Fraser River and both the Canadian Pacific and Canadian National rail lines. The bridge provides access to BC’s Interior via Highway #1.

Bridge upgrades include:

  • General Maintenance
  • Deck Repair
  • Abutment Rehabilitation
  • Bearing Replacement
  • Structural Modifications

Overview

Project 3 - Construction Monitoring – Alexandra Bridge UpgradeThe Alexandria Bridge is 490 metres long and crosses the Fraser River and both the Canadian Pacific and Canadian National rail lines. The bridge provides access to BC’s Interior via Highway #1.

Bridge upgrades include:

  • General Maintenance
  • Deck Repair
  • Abutment Rehabilitation
  • Bearing Replacement
  • Structural Modifications

Our Role

Our role is to monitor construction activities for compliance of best practices and regulatory agency requirements.

Our Role

Our role is to monitor construction activities for compliance of best practices and regulatory agency requirements.

When this project is complete, the Alexandria Bridge will be up to modern engineering code.